Won't be long now.
Monday, 14 September 2009
Thursday, 10 September 2009
Getting close now
As you can see the roughcasting is nearly done, scaffolding has been packed away and the hesh fencing will be coming down soon.
The flooring is down in all the rooms except the bathrooms. So hopefully the kitchen, the interior doors, skirting and facsias will be done by the middle of next week!
There could be trouble ahead with the drains though.........If you remember we hit rock with the foundations and we will no doubt hit rock again.
Saturday, 5 September 2009
Floor down
Wednesday, 2 September 2009
Block work finished
Finally, we have had a few dry(ish) days and the outside stuff is getting done, so much so that we now have a skip on site to start tidying up.
Hopefully we are getting Ronnie (the man with a JCB) back to bury the amoured cable for the electricity, dig a hole for the sewage plant and find the BT cover plate.
We are all set to get the big switch on next Wed and I can send the generator back!
Friday, 28 August 2009
Cills and mullions revealed
Tuesday, 25 August 2009
We nearly have electrickery!
Friday, 21 August 2009
Another taster
This is the front room, which is 'L' shaped, Sal is standing where the wood burning stove is going to be. It looks smaller in the picture than it actually is!
The rooms have all changed in size (in our minds) as the house is getting built, the kitchen is much bigger than we imagined, as is the front room.
Thursday, 20 August 2009
Plasterboard - done
The 'first fix' is done, which means the whole of the interior is all plasterboarded out, the cables are all poking through where they should be and the pipework for the plumbing is all in the right place!
This shot is upstairs, looking from the main bedroom with the en suite on the right, then the hole where the stairs will come up, followed by the office/third bedroom at the end.
The Ames taping (of the joints in the plasterboard) and a lash of undercoat is next by the painter and at the same time the sparky is in putting in all the back boxes for all the power points/sockets.
Then it is all the flooring and then the kitchen to be fitted....Wow, that's enough for one post I think!
Thursday, 13 August 2009
Roof finished and fond farewells.
Well that is the slating finished and doesn't it look fabulous. We had a meeting with the Electricity Board men today, finally they are starting soon, it has only taken over 4 months since we handed over a rather large cheque.
The telegraph poles are being delivered next week and they will be erected the following week. We are getting to the point where we can't get things done without power, such as the sewage plant and the water supply.
Sally is off to Bahrain in 10 days time so this is her saying goodbye to her parents as they are sailing to Ireland for a family wedding today and won't see her until she comes back for Xmas.
Thursday, 6 August 2009
Roof nearly done
We were going to wait until all the slating had been finished, but certain members of the family are getting impatient because they are sick of seeing Duncan on the back roof.
So, as you can see he is a day off finishing and the utility end of the house has been painted white as well as the chimney pots and dormers.
The ceilings have been plastered, so now we just need the interior wall panels fitting and then there will be some inside photos.